Testsystemconfiguration
|
1. Industrial computer host
|
2. Display
|
3. Keyboard, mouse
|
4. RS232/GPIB expansion card
|
5. Central Processing Unit
|
6. Insulation resistance tester
|
7. Programmable analog load group (the capacity is selected according to the circuit breaker)
|
8. Programmable power supply (capacity is selected according to the circuit breaker)
|
9. Test the upper computer software
|
10. Temperature tester (optional for medium and high)
|
Serial number
|
Test items
|
Test Conditions
|
JudgmentStandard
|
Equippedwithconditions
|
01
|
Withstand voltage upper limit test
|
Set voltage upper limit test
|
Non-test item
|
YES □ NO□
|
02
|
Withstand voltage lower limit test
|
Set voltage lower limit test
|
Non-test item
|
YES □ NO□
|
03
|
Voltage segment test
|
Any segment test within normal working range
|
|
YES □ NO□
|
04
|
Instantaneous voltage rise test
|
The set voltage rises instantly
|
|
YES □ NO□
|
05
|
Slow voltage rise test
|
Set voltage rises slowly
|
|
YES □ NO□
|
06
|
Undervoltage test
|
Set low voltage test
|
|
YES □ NO□
|
07
|
Overvoltage test
|
Set high voltage test
|
|
YES □ NO□
|
08
|
Withstand current upper limit test
|
Set current upper limit test
|
|
YES □ NO□
|
09
|
Lower limit of current withstand test
|
Set current lower limit test
|
|
YES □ NO□
|
10
|
Current segment test
|
Any segment test within normal working range
|
|
YES □ NO□
|
11
|
Instantaneous current rise test
|
Set the current to rise instantly
|
|
YES □ NO□
|
12
|
Slow current rise test
|
Set the current to rise slowly
|
|
YES □ NO□
|
13
|
Undercurrent test
|
|
|
YES □ NO□
|
14
|
Overcurrent test
|
Overcurrent 110%, 150%, 200%
|
|
YES □ NO□
|
15
|
30% continuous working test with load
|
Set 30% load work
|
|
YES □ NO□
|
16
|
Continuous work test with 60% load
|
Set 60% load work
|
|
YES □ NO□
|
17
|
100% continuous working test with load
|
Set to work at full capacity
|
|
YES □ NO□
|
18
|
Life test
|
40,000 consecutive times
|
|
YES □ NO□
|
19
|
Temperature test
|
continuously working
|
|
YES □ NO□
|