IPSYS 3000 series photovoltaic inverter automatic test system configuration table
|
Serial number
|
Equipment name
|
Equipment name
|
Remark
|
1
|
Test system cabinet
|
1. IPSYS 3000 system automatic test software
|
Please contact the sales staff of Zhimao for the detailed plan
|
2
|
Power analyzer
|
2. 19-inch standard system cabinet, industrial computer, monitor
|
3
|
Digital oscilloscope
|
3. System control unit
|
4
|
Anti-islanding test load
|
4. Residual current tester, insulation resistance tester
|
5
|
Power grid simulator
|
5. RS 232 / GPIB expansion card and other accessories
|
6
|
Solar cell simulator
|
More than four channels
|
Test items (automatic test and manual test two modes)
|
Serial number
|
Test items
|
Remark
|
1
|
Insulation resistance
|
|
2
|
Dielectric strength
|
|
3
|
Power factor PF measurement test
|
|
4
|
Conversion efficiency measurement
|
|
5
|
THD measurement
|
|
6
|
Harmonic order measurement
|
|
7
|
Operating Voltage
|
|
8
|
Anti-islanding protection test
|
|
9
|
Power grid overvoltage response test
|
|
10
|
Power grid undervoltage response test
|
|
11
|
Grid over-frequency response test Grid over-frequency
|
|
12
|
Power grid under-frequency response test
|
|
13
|
Overcurrent protection
|
|
14
|
Resumption of grid-connected protection test
|
|
15
|
Static MPPT efficiency
|
|
16
|
Dynamic MPPT efficiency
|
|
17
|
Voltage unbalance test
|
|
18
|
Low (zero) voltage ride through test
|
|
19
|
DC overload protection test
|
|
20
|
DC overvoltage protection test
|
|
21
|
Communication function experiment
|
|
22
|
Automatic switch machine test
|
|
23
|
Soft start experiment
|
|
24
|
Square array insulation resistance test
|
|
25
|
Square array residual current detection test
|
|
26
|
Continuous work test
|
|
27
|
DC component test
|
|
28
|
AC side short circuit protection test
|
|
29
|
Anti-reverse discharge protection test
|
|
30
|
Low temperature start test
|
Need high and low temperature test chamber
|
31
|
High temperature start and working low temperature start test
|
Need high and low temperature test chamber
|
32
|
Constant humidity low temperature start test
|
Need high and low temperature test chamber
|
33
|
Temperature rise test
|
Need temperature collector
|